How to clean the large dispensing tank?
Source: | Author:Momo | Published time: 2021-10-08 | 381 Views | Share:

Cleaning of 3 tons liquid distribution tank and filter:


After 1 or 2 tons of tank feed liquid is transferred through the filter, the inner wall of the tank and piping system are flushed online with purified water for about 10 minutes.


2 One of the tanks is sterilized with circulating steam for 30 minutes at a steam pressure of 0.35~0.4Mpa, and steam is discharged through a filter.


3 At the same time, add another tank with drinking water of more than half of the volume, boil for sterilization for 30 minutes, rinse the filter with boiling water (above 98℃), fill the filter for 3 times (the first two times water is directly discharged from the bottom, the third time water into the liquid dispensing tank to discharge).

 

4Remove the connecting valve between the filter and other tank circulation pipelines, connect the advantage to the sewer, and then use boiling water to pass through the pumping filter, after the filter is full, drain through the advantage (drain for more than 20 minutes), and filter The water in the device is drained from the bottom, and the quick-connect valve is connected to the circulating pipe.

 

Cleaning of 5 ton liquid tank and infusion pipeline:


1 Flushing: Use purified water to flush the inner wall of the tank and the piping system online for 10 minutes with purified water, remove the probe and install it after cleaning.


2 Alkaline washing: Heat about 500L of 2% lye to 80~85℃, and pump it into a 5 ton tank online through the cleaned movable pump, and turn on the No. 2 pump for online circulation for 20 minutes. Collect the lye in the 5 tons tank.


3 Boiling water flushing: 1 Fill the tank with purified water, heat it to boiling, pump boiling water into a 5 ton tank online and circulate it for 10 minutes at the same time to drain the water. 2 Continue to pump boiling water to the filling room for cleaning. 3 Open the steam valve on the upper tank in the filling room, and sterilize the liquid infusion pipeline and the upper tank to the filling room with circulating steam for 30 minutes, and the steam pressure is 0.3~0.4Mpa.


4 After the site is cleared, the 5 ton tank probe is disassembled and cleaned, disinfected with 75% ethanol and then installed, the remaining water in the pipeline is drained through the quick-connect valve removed before the delivery pump (the water in the pump is also drained), and then installed Quickly connect the valves and close all valves.


 ​            ZHONGHAO Machinery Technology Co.,Ltd. 

 No. 5, Lane 10, Yantai South Road, Shacheng Street, Wenzhou, Zhejiang, China

                                            Zipcode:​325000 

                                            Tel:+86-0577-86818000​

                                            Mail:conweb@zh2100.com

                                            Web:http://zh2100.com 

                             © ZHONGHAO ALL RIGHTS RESERVED