Installation and commissioning of emulsification pumps
Source: | Author:Momo | Published time: 2021-10-26 | 364 Views | Share:

When you receive the emulsification pump from Zhonghao, you need to install and commission the stainless steel emulsification pump, so how to install and commission the emulsification pump? The following Zhonghao will explain to you - how to install and commission the emulsification pump?

 

1. Check whether the import and export seals of the high shear dispersion emulsification pump are intact, and whether there are debris, metal chips and other substances that damage the equipment mixed into the body.

 

2. Check whether the motor and the whole machine are damaged during transportation or out of storage, and install safety contact electrical devices when connecting the power switch.

 

3. Clean the process pipeline before connecting the import and export of this equipment to the I art pipe Thule, and make sure that the process pipeline is free of welding slag. Metal shavings, glass shavings, quartz sand and other hard substances that can damage the equipment before

Connect with the machine.

 

4.Zhonghao BRL pipeline emulsification pump installation location selection and container near the part such as the bottom of the container. The pipeline must be simple and direct, reducing the use of elbow pipeline components as much as possible. Thus reduce the resistance of the material in the process of circulation.

 

5. The installation position of Zhonghao BRL inter-singing emulsification pump is suitable to keep vertical level with the container, such as dumping, must be well sealed, moisture-proof, dust-proof, moisture-proof and explosion-proof.

 

6. Before turning on the machine, first of all, the spindle should be rotated, and the hand should feel light and heavy, flexible, without other frictional and abnormal sounds.

 

7. When installing the pipeline of Zhonghao BRL in-line emulsification pump, the import and export pipeline adopts quick-fit clamp live connection structure.

 

8. After all the above work is completed, start the power supply device and repeatedly switch to check whether the motor steering is consistent with the steering mark of the active shaft, and forbid reversing and idling. If the machine operates normally, it can be used for production.

 

 


 ​            ZHONGHAO Machinery Technology Co.,Ltd. 

 No. 5, Lane 10, Yantai South Road, Shacheng Street, Wenzhou, Zhejiang, China

                                            Zipcode:​325000 

                                            Tel:+86-0577-86818000​

                                            Mail:conweb@zh2100.com

                                            Web:http://zh2100.com 

                             © ZHONGHAO ALL RIGHTS RESERVED